Translate
Default
English
Español
Français

User Access


ICP En Espanol -  Ad - APOC Contratista Programa Pro
Certainteed - contractor credentialing
RCS En Espanol -  Ad - LVR
SRS -  Ad (En Espanol Page) - Credit Application
MuleHide -  Ad - The Right Products - Spanish Version
TAMKO  - HailGuard- June -  Ad en Espanol
Coffee Conversations
Translate
Default
English
Español
Français

Nailing deck through secondary water barrier?

« Back To Roofers Talk
Author
Posts
September 17, 2018 at 9:40 a.m.

chazbow

I recently had a new roof installed in South Florida with Owens Corning Weatherlock peel and stick water barrier and Duration shingles. After I had a wind mitigation inspection we discovered the deck was not renailed with #8 ring shank nails every 6" per code. The roofer admitted they may not have renailed the entire roof and want to tear off some of the shingles and nail through the secondary water barrier and then replace the shingles.

My question, is it advisable to nail the deck through the secondary water barrier? Is it even possible to remove the peel and stick without damaging the deck. What are your opinions on fixing this so it meets code and passes wind mitigation.

Thanks for reading


« Back To Roofers Talk
You must be logged in to reply to this topic.

SRS - Banner Ad (En Espanol Page) - Nueva Cuenta/Sistema de Solicitud COD
Translate
Default
English
Español
Français

User Access


ICP En Espanol -  Ad - APOC Contratista Programa Pro
MuleHide -  Ad - The Right Products - Spanish Version
Certainteed - contractor credentialing
SRS -  Ad (En Espanol Page) - Credit Application
RCS En Espanol -  Ad - LVR
TAMKO  - HailGuard- June -  Ad en Espanol