English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
ABC Supply -  Ad - Deliver success in any project
Wil-Mar -  - March2026
Johns Manville -  Ad - Skylights 101
TAMKO -  Ad - Hailguard April Campaign Spanish
GenFlex -  Ad - New Website
All Weather Insulated Panels -  Ad - InnovaCELL
English
English
Español
Français
« All Events

Deciphering the Complexity of Adhered Veneer Wall Systems

March 5, 2026 @ 12:00 pm - 1:00 pm CST

abaa - education - SM

 

Adhered veneer cladding systems have gained popularity in the past decade with increased use in all climates across the county. Today this type of construction is not only seen on high-end residential, but a common facade element on educational institutions, hospitals, airports and other commercial type buildings. While adhered veneer wall system have garnered the derogatory “lick and stick” label and are historically seen as economical, value engineering options, these systems have evolved significantly, as well as the codes and standards used to design and construct them. With the increased complexity of adhered veneer systems, deciphering the multiple building codes, standards, industry guidelines and manufacturer’s installation instructions can be challenging. Drawing on WJE’s extensive experience investigating failures of these systems, this presentation will highlight code-compliance pathways, key resources available for design and construction and general strategies to achieve a successful adhered veneer installation; inclusive of field testing and evaluation strategies.

Learning Objectives:

1. List the design requirements between prescriptive design versus engineered design for adhered veneer systems
2. Identify industry guides and standards (i.e., ASTM/ANSI) related to adhered veneer products and installation of adhered veneers.
3. Describe at least three of the most common failure mechanisms of adhered veneer systems.
4. Summarize key quality control steps to consider during construction that can lead to a successful installation.

Presenter: Renae Kwon, Registered Architect (IL, WI, AZ, IN), Associate Principal, Wiss, Janney, Elstner Associates

Register now.



Details

Mar 5, 2026 @ 12:00 pm CST
Mar 5, 2026 @ 1:00 pm CST

SOPREMA - Banner Ad - Furbish BioWall
English
English
Español
Français

Sign Up for Our E-News!

Join over 18,000 other roofers who get the Week in Roofing for a recap of this week's best industry posts!

Sign Up
Sherwin-Williams -  Ad - MetalRoofingElements - Fire
https://ad.doubleclick.net/ddm/trackclk/N30602.4638641ROOFERSCOFFEESHOP/B34763147.443088604;dc_trk_aid=636638283;dc_trk_cid=252286514;dc_lat=;dc_rdid=;tag_for_child_directed_treatment=;tfua=;gdpr=${GDPR};gdpr_consent=${GDPR_CONSENT_755};ltd=;dc_tdv=1
FRSA -  Ad - FRSA Convention 2026
Certainteed -  Ad - Landmark Climate Flex
RCS -  - L&L contest
Bitec -  Ad - 40 Years of Excellence